Example of Industrial Expansion from 4construct

  • Writer: 4Construct
    4Construct
  • Aug 12
  • 3 min read

At 4construct, we believe that growth and business continuity shouldn't be mutually exclusive. For many businesses, the prospect of expanding their facilities comes with the daunting challenge of potential disruption to their day-to-day operations, often putting them off industrial refurbishment.


This is a common and valid concern, particularly for large-scale industrial companies where even a brief pause in production can result in significant financial losses. We’ve built our reputation on addressing this very challenge, enabling businesses to grow their physical footprint without compromising their ongoing workflows.



Our recent partnership with the blue-chip company Smurfit Kappa stands as a prime example of this philosophy in action. Smurfit Kappa, a global leader in paper-based packaging, needed to expand their operational capacity. This wasn't a case of building a new facility from the ground up; it involved a substantial 56,000 sq ft extension to their existing, fully operational site. The key challenge? Delivering this complex project without causing any disruption to their live manufacturing processes.


Meticulous Planning and Phased Construction


The success of the Smurfit Kappa project was a direct result of our meticulous planning and strategic, phased approach. We began by thoroughly analysing their existing workflows and operational rhythms. This allowed us to develop a construction plan that was carefully orchestrated around their production schedule. We identified key areas where work could proceed with minimal impact, and we established clear, safe zones to separate the construction site from the live factory floor. This initial phase of intense planning and collaboration with the client was crucial. It ensured that our construction activities, from groundworks to the final fit-out, were seamlessly integrated with their operations rather than being a source of interference.


Throughout the project, our team worked closely with Smurfit Kappa's management to ensure a smooth flow of communication. This continuous dialogue allowed us to adapt our plans in real-time, addressing any potential issues before they could escalate. We employed a range of strategies, such as scheduling noisier or more disruptive tasks during planned downtime or outside of peak operational hours. Our team also implemented robust health and safety protocols to ensure the well-being of both our construction workers and Smurfit Kappa's employees.


Delivering Enhanced Capacity and Future-Proofing


The completion of the 56,000 sq ft extension has provided Smurfit Kappa with a significant boost in operational capacity and efficiency. The new space was designed not just to meet their immediate needs, but also to support their future growth ambitions.


This forward-thinking approach is a cornerstone of our work at 4construct. We don’t just build extensions; we create strategic assets that allow businesses to scale their operations and remain competitive in their respective markets.

The project is a powerful testament to our expertise in delivering complex industrial extensions. It showcases our ability to manage intricate logistics, navigate the challenges of a live operational environment, and ultimately deliver a high-quality, functional space on time and within budget. We understand that for businesses looking to expand, the process can seem daunting. Our mission is to remove that burden by providing a seamless, disruption-free path to growth.


If you're considering expanding your operations, such as undergoing a warehouse refurbishment, and want to ensure your business stays fully functional throughout the process, we're ready to help. Our team has the knowledge, experience, and dedication to make it happen.


Contact us today at enquiries@4construct.co.uk to discuss your next project.